Step | | Procedure & Parts & Tools |
1 |
|
TURN MACHINE OFF
|
2 |
|
DRAIN TANKS AND REMOVE 13MM BOLT.
Ratchet-Socket metric 13mm |
|
|
3 |
|
LIFT THE TANK TO OPEN THE MACHINE
|
4 |
|
TRACE THE CABLE TO THE BATTERY COMPARTMENT AND CUT THE CABLE TIE.
Wire cutters |
|
|
5 |
|
REMOVE CABLE FROM POWER BOARD
|
6 |
|
OPEN BACK PANEL...6 T30 TORX SCREWS
Torx T30 |
|
|
7 |
|
CUT ZIP TIES IN THE HARNESS.
Wire cutters |
|
|
10 |
|
REMOVE THE 5 SCREWS FROM THE CONTROL PANEL
Torx T25 |
|
|
11 |
|
PULL THE CONTROL PANEL OUT TO LOCATE THE COMMUNICATION CABLE
|
12 |
|
PULL CABLE
|
13 |
|
PULL CABLE DOWN THROUGH THE HANDLE. FOLLOW THE SAME PATH WITH THE NEW CABLE, AND SECURE WITH ZIP TIES THROUGHOUT THE HARNESS
|